0704-883-0675     |      dataprojectng@gmail.com
1

1. AN ASSESSMENT OF ROLE OF ESTATE SURVEYOR AND VALUER IN PROJECT MANAGEMENT

ABSTRACT

Performance of building projects is affected by several factors. The focus here is on the relationship between Project Management Practices carried out by Estate surveyor and Valuer and project performance. Estate surveyor and...

Read more

2. INFLUENCE OF ESTIMATING PRACTICE ON COST PERFORMANCE OF BUILDING PROJECT

ABSTRACT

This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the estimating practices used by cost consultants, appraise the critical factors influencing estimating practice used, and to de...

Read more

3. ASSESSMENT OF FACTORS AFFECTING COST PERFORMANCE CONSTRUCTION PROJECT IN NIGERIA

Abstract

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no e...

Read more

4. ASSESSMENT OF THE FACTOR AFFECTING THE COST PERFORMANCE OF THE CONSTRUCTION PROJECT

ABSTRACT

This study investigates the factors affecting cost performance of construction projects in Lagos State located in the south-western part of ...

Read more

5. INFLUENCE OF LABOUR PRODUCTIVITY ON THE COST PERFORMANCE OF THE TRADITIONALLY PROCURED PROJECTS

ABSTRACT

Based on low productivity problems facing the global construction industry, this study evaluated the influence of labour productivity on cost performance. The objectives include to identify productivity related factors influencing cost performance; determine the most significan...

Read more

6. STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES

Abstract

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no e...

Read more

7. STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES

Abstract

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no e...

Read more

8. AN ASSESSMENT OF COST PERFORMANCE AND ACCOUNTABILITY IN PRIVATIZED PUBLIC ENTERPRISES IN NIGERIA. A STUDY OF OANDO (UNIPETROL) PLC IN ENUGU STATE

Abstract

Despite an impressive level of privatization activity across Africa and the upsurge in search of the operating performance of privatized firms in both develop and developing economies, our empirical knowledge of the privatization program in Africa is limited. The purpose of thi...

Read more

9. INFLUENCE OF COST CONTROL PRACTICES ON THE COST PERFORMANCE OF CONSTRUCTION PROJECTS IN ABUJA-FCT, NIGERIA

ABSTRACT

The Nigerian Construction Industry (NCI) faces numerous cost-related challenges that have in some cases increased costs of construction projects by up to 61.84%. Such challenges include the increasing complexity of construction projects which necessitate specia...

Read more

10. AN ASSESSMENT OF THE EFFECTIVENESS OF COST PLANNING TOOLS AND TECHNIQUES ON CONSTRUCTION PROJECT PERFORMANCE IN NIGERIA

BACKGROUND OF THE STUDY

It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The...

Read more
whatsapp