ABSTRACT
The 200W solar system was determined by load assessment, solar panel number determination, battery requirement and then inverter sizing. A complete solar panel rated at 200w was however purchased, together with 2 no. 150A solar battery, 1500W inverter and also 10A charge controller. These were assembled together with necessary protective gadgets like cut out switches; to give the 200W expected. The solar panel was mounted outside the building to allow for maximum collection of sun energy. It is expected that the system will help the department meet up with its office duties even when central power is not available.
Statement of Research Problem
The construction industry comprises of various professions such as civil engineering, building, architectur...
Abstract: This study explores the implementation of STEAM education in early childhood settings to foster creativity, critical thi...
Abstract: THE ROLE OF FUND ACCOUNTANTS IN FUND PERFORMANCE ANALYSIS
This study aims to: (1) evaluate the role of fund accountants in fund...
ABSTRACT: Strategies for Promoting Diversity and Inclusion in Technical Education are crucial for creating equitable learning environments and...
ABSTRACT
This study investigated the impact of personnel management on the performance...
ABSTRACT
This research work assesses the impact of agricultural policies on Nigerian economy. The study...
ABSTRACT
This project work focuses on the effects of child abuse on students’ academic performance. The study atte...
Abstract
This study was conducted to assess knowledge, attitude and practice of cancer prevention strategies among staff of Federal unive...
Abstract: This research explores the role of project management tools in improving project outcomes, with ob...
ABSTRACT
Counselling needs are needs of a student that are required to resolve ...