ABSTRACT
The non-implementation of risk management techniques constitutes a lot to most of the project failures encountered nowadays. This leads to variations, incessant claims due to time loss by the contractor and loss of significant stakeholder’s value. This study assessed risk response techniques for construction projects under Design Bid Build and Design & Build (DBB and DB) procurement methods in Abuja, with a view to enhancing the level of understanding and implementation of risk management in DBB and DB procurement methods. Data were collected from 150 respondents who are professionals working under companies registered with Federation of Construction Industry (FOCI). Tools used for data analysis were Relative Importance Index (RII) and Mean Item Score (MIS). Findings from the study revealed six (6) major risk response techniques that are often practiced on construction projects with average RII of 0.71. The most effective risk response techniques in construction projects are “Risk mitigation/Reduction” and “Risk Acceptance” (MIS = 3.94 and 3.60 respectively). “Insurance” is the most effective risk sharing technique for DBB procurement method (RII = 0.81). On the average, the risk sharing techniques for DBB procurement method are effective in construction projects procurement (average RII = 0.70). The most effective risk sharing technique under the DB procurement method is “Warranty” (RII = 0.71). On the average, the risk sharing techniques under the DB Procurement method are effective in construction projects procurement (average RII = 0.61). It was concluded that the risk sharing and response techniques under the Design Bid Build (DBB) and Design and Build (DB) procurement methods are effective. However, the techniques for the sharing and responding to risks in construction projects under the DBB procurement method are more effective than the risk sharing and response techniques under the DB procurement method in Abuja, Nigeria. It was therefore recommended that stakeholders should consider the use of DBB procurement method for procuring projects in order to respond to risks in construction projects more effectively
Background of the study
Schistosomiasis, caused by parasitic flatworms of the genus Schistosoma, remain...
ABSTRACT
This project is on ‘’the assessment of the effect of human resource development on employee product...
Abstract
This study examined people’s perception of the abuse of democracy in the socio-political development. Th...
ABSTRACT
This study is motivated by the existence of a deficiency in the financial reporting system in...
Abstract
The advent of internet and technology has exposed majority of the global population to different interactive p...
ABSTRACT: This study examined the Impact of Early Childhood Education on Entrepreneurial Mindset. The object...
ABSTRACT:- This research work was designed to finding out the importance of indigenous lang...
BACKGROUND OF THE STUDY
There is no doubt that the level of development in a country is directly propor...
ABSTRACT
Proper hand hygiene is the key to reducing occurrence of infectious diseases in many different t...
Abstract
This research explores effective strategies for building a strong foundation in early childhood literacy development, focusing o...