0704-883-0675     |      dataprojectng@gmail.com

STRATEGY FOR PUBLIC PRIVATE PARTNERSHIP (PPP) IN NIGERIAN PUBLIC INFRASTRUCTURE MAINTENANCE

  • Project Research
  • 1-5 Chapters
  • Abstract : Available
  • Table of Content: Available
  • Reference Style: APA
  • Recommended for : Student Researchers
  • NGN 3000

ABSTRACT

Infrastructure provides the foundation of every nation‟s economy and quality of life, thus investing in aging infrastructure therefore, is essential in supporting healthy and vibrant communities. Inadequate supply, very poor state of available infrastructure coupled with poor maintenance culture of the few existing ones lead to decay and deterioration. This has been adjudged the major hindrance to ease of doing business in Nigeria. Thus, this study was aimed at developing strategies for public private partnership (PPP) in Nigerian public infrastructure maintenance. The study utilised a mixed methods approach adopting questionnaires, interview and observation methods in collecting of data. Simple random sampling was used in the questionnaire survey among the construction professionals, while a purposive sampling technique was used for selecting the participants for the interview. With a response rate of 40.08%, the gathered data were analysed using percentile, mean item score (MIS), relative importance index (RII), regression analysis, and content analysis. The study found that building walls, painted surfaces, toilet facilities, electrical services and floor are the components of building requiring frequent maintenance. Also, public buildings are in bad state, and this condition was attributed to no maintenance culture, and poor budgetary provision for maintenance. The current models for infrastructure maintenance are „labour only method‟ and „direct labour methods‟. High life cycle cost, poor quality of maintenance work, weak/little competition in public services, Inefficient risks allocation, and Delay in infrastructure provision, maintenance and additional revenue; are the limitations of the current maintenance system used. The major effects of PPP maintenance model on infrastructure are: PPP Improves/ better Service Quality of maintenance work, PPP maintenance contract will help to prevent sudden breakdown of building component and equipment, PPP ensures More Efficient Allocation of Risk, the use of PPP model will help to Prevent building collapse. It was concluded that PPP has the potential to change the maintenance narrative of public infrastructures. It was recommended to engender the culture of maintenance and adequate budgetary provision for maintenance work.





Related Project Materials

BUDGETING AS AN INSTRUMENT OF INTERNAL CONTROL IN A MANUFACTURING ORGANIZATION

ABSTRACT

An efficient budgeting control system is one that produces the desired result. A balanced budget is the one that produces no var...

Read more
THE IMPACT OF INCREMENTAL BUDGETING ON ORGANIZATIONAL EFFICIENCY

THE IMPACT OF INCREMENTAL BUDGETING ON ORGANIZATIONAL EFFICIENCY

The objectives of this research are to: (1) analyze the impact of increm...

Read more
A SURVEY OF THE IMPACT OF WOMEN’S EDUCATIONAL STATUS ON CHILDREN UPBRINGING IN YALA LOCAL GOVERNMENT AREA OF CROSS RIVER STATE

 

ABSTRACT

This project was carried out to find out the impact of women educational status o...

Read more
AN EVALUATION OF THE IMPACT OF FRIENDLY ENVIRONMENT ON THE COMPREHENSIVE LEARNING OF SCHOOL CHILDREN

BACKGROUND OF THE STUDY

 A learning-friendly environment (LFE) accepts, nurtures, and educates all...

Read more
FACTORS MILITATING AGAINST EFFECTIVE MANAGEMENT OF SCHOOL RECORDS BY SECONDARY SCHOOL PRINCIPALS

ABSTRACT

This study investigated the factors militating against the management of school record by Secondary School Prin...

Read more
ASSESSMENT OF PERSONAL INCOME TAX ADMINISTRATION IN NIGERIA A STUDY OF AKWA IBOM STATE BOARD OF INTERNAL REVENUE

Abstract

Creating a good tax system implies that taxes should be collected regularly, consistently, conveniently and aff...

Read more
INFLUENCE OF INFORMATION NEEDS AND INFORMATION SEEKING ATTITUDE OF STUDENTS IN PUBLIC LIBRARIES

Abstract

Information needs and information seeking pattern of public library users are varied on account of their differ...

Read more
DESIGN AND IMPLEMENTATION OF PEER TO PEER NETWORK FOR FILE SHARING

CHAPTER ONE

INTRODUCTION

1.1 Background of the Study

File sharing...

Read more
SERUM LIPID PROFILE OF AFRICA MESQUITE TREE PART EXTRACT IN RAT

ABSTRACT

This study investigates the lipid-modulating effects of extracts from different parts of the A...

Read more
IMPLICATIONS OF THE IMPLEMENATATION OF THE TREASURY SINGLE ACCOUNT ON THE PERFORMANCE OF COMMERCIAL BANKS IN NIGERIA

Abstract

This paper investigated the impact of Treasury Single Account (TSA) on Banks’ performance in Nigeria. Sec...

Read more
Share this page with your friends




whatsapp