Abstract
Characterization and flotation studies were carried out on the Nasarawa-Eggon leadzinc ore sample through Chemical analysis, Mineralogical analysis, Petrological analysis, Work Index evaluation, Particle size/mineral assay analysis, Liberation studies Bulk Froth Flotation and development of a flow sheet. The chemical analysis was carried out using XRF machine to estimate the elements in the ore sample, the analysis revealed that the ore deposit is mainly made up of 16.78%Pb, 12.60%Zn, 21.25%Si, 2.03%Fe, 1.58%Mn, 1.64%Cu. The mineralogical analysis consist of XRD analysis which was carried out using XRD machine, SEM analysis using SEM and Petrological analysis using petrological microscope after thin sectioning. The XRD analysis revealed that the predominant crystalline minerals in the ore sample are Quartz (SiO2), Galena (PbS) and Sphalerite (ZnS) which showed a high phase of 45.2%, 38.7% and 16.0% respectively, the SEM analysis result revealed that the minerals in the ore have different particle sizes, are separated by grain boundaries and are also finely disseminated within each other and the Pretrological analysis showed that the Sulphide minerals (PbS and ZnS) and Quartz occur in close spatial associations and also as intergrowths. The particle size/mineral assay analysis showed that the minerals were distributed on the various sives sizes. The liberation size of the ore was hard to determine because of the dissemination of the minerals within each other. Meanwhile, after the chemical analysis of the various sieve sizes using XRF machine, the mineral has a high degree of freedom the sieve size of -125+90µm. The work index of the ore was evaluated to be 11.64KWh/t using the Bond‘s energy method. A bulk flotation test was carried out in the reverse form at -125+90µm sieve size and the ore was upgraded from 16.30%Pb and 9.79%Zn to 42.43%Pb and 34.57%Zn with 81.65% and 87.30% recovery respectively. Based on the results obtained from the tests conducted, block diagrams where us to vii develop a flow sheet for the beneficiation of the Nasarawa-Eggon lead-zinc ore. The results obtained were compared with that of the literatures cited, the research bridged the existing gap in the previous researches of not adequately providing useful information on the beneficiation parameters of Nasarawa-Eggon Lead-Zinc ore. Nasarawa Eggon Lead-Zinc ore may be another potential source of Lead-Zinc ore deposit that can be beneficiated and supplied to iron and steel making industries in the country
ABSTRACT
This study investigates the relationship between public debt and economic growth in Nigeria over the period...
ABSTRACT
This research work is designed to develop effective strategy for pension administration in the Nigeria public sector, using pens...
Background of the study
Ethical product promotion has emerged as a critical factor in building consumer trust, particula...
Background of the Study
Chemotherapy is one of the primary treatments for cancer, often associated with side effects such as nausea, fati...
ABSTRACT
The study conducted in Plateau State set out to find out the perception of the residents in the selected study areas of Jos Nort...
Chapter One: Introduction
1.1 Background of the Study
Gender representation in media is a critical aspect of social development...
Background of the study
Supplier Relationship Management (SRM) refers to the strategic approach organizations take in ma...
ABSTRACT
This study was carried out to critic...
ABSTRACT
The proper management and utilization of financial resou...
Background of the Study
Religious charity organizations have emerged as key players in addressing poverty in many communit...