ABSTRACT
This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects. This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria. According to this study, inadequate planning, incompetent project manager, variation in project scope, political factors, price fluctuation etc., contributes to the delays and disruption of building construction project and thereby affecting their cost also. Most of the proper majors are recommended for the elimination of delays and disruptions on construction project i.e Adequate pre-contract study, engaging competent construction professionals etc.
ABSTRACT
This study was carried out to examine forensic accounting as a tool for fraud detection a...
ABSTRACT
The study deals on children and mass media use: A study of the vote of mass media use in child...
ABSTRACT
The subject matter of this research work is to evaluate the extent to which Small Scale entrepreneurs in Enugu have been abl...
ABSTRACT
The main purpose of this research work was to examine the analysis of federal character and quota system in Nig...
ABSTRACT
The topic of dissertation is The Role Of Commercial Banks In Financial Small Scale Industry In Nigeria. A case...
ABSTRACT
This research project is a very crucial study on the effects on tax evasion and avoidance on N...
Abstract
Waste Management is pertinent in achieving sustainable Development, which is fuelled by the growing concern fo...
Background to the Study
In the turbulent business environment, with changes in customer demands the mai...
Background of study
Richard A. Joseph… is usually credited with first using the term prebendalism to describe...
ABSTRACT
Kede floodplain is under constant threat of devastating floods annually. The rural dwellers adopted strategies and even the gove...