ABSTRACT
This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effective realization of construction projects This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contractors for better estimating. 84 questionnaires were sent out, 28 to con tractors, 28 to clients, and 28 were sent to the consultant firms respectively. 25 questionnaires were received from each of the respondent categories, representing 89% using the simple random sampling technique. The collected data were analyzed using the Relative importance Index. The study found out that a statistically significant relationship existed between the clients, consultants, and contractor on the essential factors affecting accuracy of pre-tender cost estimate. It was concluded that: Experience and skill level of the consultants ranked with overall Ru of 0.9, project teams experience on the construction type 0.87, clear and detail drawings and specification, completeness of cost information, accuracy and reliability of cost information are the most significant factors affecting accuracy of pre-tender cost estimate were other paramount factors. The most appropriate cost estimating method at the design stage according to the respondents ranking is subjective estimating with Ru of 0.78 and parametric estimating 0.46 and synthetic estimating 0.52. It was recommended that Clients should always engage the services of skilled quantity surveyors to undertake the consultancy services in cost estimating process.
Background to the study
The university plays a central role in the development of a nation; it provides the intellectual...
ABSTRACT
This study analyzed the effect of forest resources exploitation on economic well-being of farming households. In carrying out th...
Abstract: COMPARATIVE ANALYSIS OF FINANCIAL MANAGEMENT PRACTICES IN DEVELOPED AND EMERGING MARKETS
This research conducts a comparative a...
ABSTRACT
Solid waste management has become the greatest problem facing many urban and semiurban areas in Nige...
ABSTRACT
THE INFLUENCE OF REGULATORY CHANGES ON INVESTMENT PRACTICES
This study examines the influence of regulatory changes on...
STATEMENT OF THE PROBLEM
Many empirical studies have investigated the existence of a relationship betwe...
Abstract
This study focuses on customers’ behavior and how it affects the growth of a business (a case study of Vi...
Background to the Study
Educational institutions are significant places where next generations are assembled for trainin...
Abstract
Maintaining steady cost projection on construction projects had been until recently an issue of serious concern...
ABSTRACT
In this research work, the researcher intended to have a general discussion with local government as my backgro...