CHAPTER ONE
INTRODUCTION
STATEMENT OF PROBLEM
A scheduling situation in a transport company develops when buses are expected to dispatch effectively. Scheduling needs the dispatch and general information about routes to generate optimal transportation resources schedules. Lack of management and scheduling modules have cause a big problem for most transport companies. As a result of these problems, these transport companies have not been able to present charts and text reports for these companies.
These transport companies can not export solutions as text files in MS Word or MS Excel.
Lack of scheduling algorithms have led to lack of generating of the different resources schedules.
Lack of near-optimal resources schedules generation have prevented benchmarking an existing solution. Existing routes along with resources assignments can not be imported into the system “as is’ and calculate to reproduce the benchmark solution. The solution can not be generated and compared to the benchmark solution. The two solutions cannot be compared in the form of reports and Grantt Charts to identify opportunities for better resources utilizations.
Route data can not be imported in the form of ASCLL files.
There is no data import wizard that will guide user’s through a set up process for importing route data into the system. Lack of data view to enable user’s to sort the routes based on different criteria (route ID) Departure Time etc).
PURPOSE OF THE STUDY
This research work is meat to find out whether the above mentioned problems can effectively be eradicated by employing computer system to control the scheduling system of a transport company. In other words, to find solution to these problems mentioned above using a computer system.
AIMS AND OBJECTIVES
The aim and objective of this research work is to come up with a more suitable scheduling system in a transport company. (A computer based scheduling system) that can eliminate completely the above mentioned problems using a computer system. For instance, to come up with a scheduling system that can generate optimal buses and driver schedules for a given dispatching scenario.
Perhaps, the new system will not just eradicate the problems which will automatically improve the schedules.
SCOPE OF THE STUDY
This project work covers every area of scheduling activities where a scheduling tool generates optimal buses and drives schedules for a given dispatching scenario.
For instance, this tool provides an estimate of required number of buses and drivers for a particular dispatching scenario. It also generates resource scheduling that can result in significant cost reduction by using the optimal number of resources required.
ABSTRACT
This work titled “Fraud Control in the Local Government System; Challenges and Prospects; A Study of Ebon...
ABSTRACT
This study examined the effect of interest rates on savings in Nigeria Using multiple regression analysis. The...
ABSTRACT
A lot of problems are associated with the traditional way of teaching mathematics because it uses manual approa...
ABSTRACT
This research work is carried out to determine the problems of physical distribution management in a beverage i...
ABSTRACT
The research work examined the Effect of Interest Rate on Investment and Money Demand in Nigerian Economy&...
Background of the study
Career play a very fundamental and...
Abstract
The study aimed at exploring the impact of teachers‟ motivation on the improvement of quality teaching and lear...
ABSTRACT
This research work is aimed at studying Information Technology and the Performance of the Nigeria Stock Exc...
THE INFLUENCE OF BUDGETING SOFTWARE ON FINANCIAL PLANNING
The objectives of this research are to: (1) analyze the impact of budgeting sof...
ABSTRACT
The purpose of this research work is to investigate the effect of class size in effective teaching and lear...